Skip to content

The Standards Council of Canada requires all proposed standards be made available for a 60-day public review during the development process, allowing input from interested parties.

These documents are issued for the purpose of generating critical review and comment. The application of material contained in these documents for other purposes, such as its use in judging a product for compliance with current requirements or determining future product needs, would be premature and could be misleading.

To obtain copies of these documents, please contact:
Standards Operations Manager: Brian Murphy
E-mail: Brian.P.Murphy@ul.com
Phone: 613-755-2729 (61421)
Fax: 613-231-5977

Address: ULC Standards
171 Nepean Street, Suite 400, Ottawa, ON, K2P 0B4

The Proposed Revision to Second Edition CAN/ULC-S302-14, Standard for the Installation, Inspection and Testing of Intrusion Alarm Systems, has been submitted to the ULC Standards Committee on Security and Burglar Alarm Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/October/18
Date Due: 2017/December/18

The proposed Reaffirmation of the First Edition of CAN/ULC-S338, Standard for Automobile Theft Deterrent Equipment and Systems: Electronic Immobilization, is available to the public for comment.

Date Posted: 2017/October/26
Date Due: 2017/December/26

The proposed Fifth Edition of CAN/ULC-S508, Standard For Rating and Fire Testing of Fire Extinguishers, is available to the public for comment.

Date Posted: 2017/October/27
Date Due: 2017/December/27

The proposed First Edition of ANSI/CAN/UL/ULC-2258, Standard for Aboveground Nonmetallic Tanks for Fuel Oil and Other Combustible Liquids, has been submitted to the Joint UL/ULC Technical Committee on Combustible Liquid Tanks and Accessories, for letter ballot approval and to others interested for comment.

Date Posted: 2017/October/27
Date Due: 2017/December/27

The proposed Fifth Edition of CAN/ULC-S115, Standard Method of Fire Tests of Firestop Systems, has been submitted to the ULC Technical Committee on Fire Tests, for letter ballot approval and to others interested for comment.

Date Posted: 2017/October/30
Date Due: 2017/December/29

The Proposed Revision to Third Edition CAN/ULC-S304:2016, Standard for Control Units, Accessories and Receiving Equipment for Intrusion Alarm Systems, has been submitted to the ULC Standards Committee on Security and Burglar Alarm Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/November/08
Date Due: 2018/January/08

The Proposed Third Edition CAN/ULC-S559, Standard for Equipment for Fire Signal Receiving Centres, has been submitted to the ULC Standards Committee on Fire Alarm and Life Safety Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/November/16
Date Due: 2018/January/16

The Proposed Third Edition CAN/ULC-S561, Standard for Installation and Services for Fire Signal Receiving Centres, has been submitted to the ULC Standards Committee on Fire Alarm and Life Safety Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/November/23
Date Due: 2018/January/23

The Proposed Reaffirmation of the First Edition CAN/ULC-9705 (ISO 9705:1993, MOD), Standard for Fire tests – Full-scale room test for surface products, has been submitted to the ULC Standards Committee on Fire Tests for letter ballot approval and to others interested for comment.

Date Posted: 2017/November/28
Date Due: 2018/January/29

The Proposed Reaffirmation of the Third Edition CAN/ULC-S110, Standard Methods of Test for Air Ducts, has been submitted to the ULC Standards Committee on Fire Tests for letter ballot approval and to others interested for comment.

Date Posted: 2017/November/28
Date Due: 2018/January/29

The Proposed Reaffirmation of the Second Edition CAN/ULC-S134, Standard Method of Fire Test of Exterior Wall Assemblies, has been submitted to the ULC Standards Committee on Fire Tests for letter ballot approval and to others interested for comment.

Date Posted: 2017/November/28
Date Due: 2018/January/29

The First Draft of the proposed Third Edition CAN/ULC-S301, Standard for Signal Receiving Centre Configuration and Operations, has been submitted to the ULC Standards Committee on Security and Burglar Alarm Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/November/29
Date Due: 2018/January/29

The First Draft, Proposed First Edition CAN/ULC-S1981, Signal Receiving Centre Automation Systems, has been submitted to the ULC Standards Committee on Security and Burglar Alarm Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/December/06
Date Due: 2018/February/06

The Proposed Reaffirmation of the First Edition CAN/ULC-S530, Standard for Heat Actuated Fire Detectors for Fire Alarm Systems, has been submitted to the ULC Standards Committee on Fire Alarm and Life Safety Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/December/12
Date Due: 2018/February/9

The Proposed Reaffirmation of the Second Edition CAN/ULC-S513, Standard for Threaded Couplings for 38 mm and 65 mm Fire Hose, has been submitted to the ULC Standards Committee on Fire Protection Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/December/12
Date Due: 2018/February/12

The Proposed Reaffirmation of the Third Edition CAN/ULC-S515, Standard for Automobile Fire Fighting Apparatus, has been submitted to the ULC Standards Committee on Fire Protection Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/December/12
Date Due: 2018/February/12

The Proposed Reaffirmation of the Third Edition CAN/ULC-S555, Standard for Fire and Emergency Service Technical Rescue Ropes and Water Rescue Throw Ropes and Associated Equipment, has been submitted to the ULC Standards Committee on Fire Protection Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2017/December/12
Date Due: 2018/February/12

The Proposed Revisions to the First Edition CAN/ULC-S2271, Standard for Batteries for Use In Light Electric Vehicle (LEV) Applications, has been submitted to the ULC Standards Committee on Batteries for Electric Vehicles (EVs) for letter ballot approval and to others interested for comment.

Date Posted: 2017/December/22
Date Due: 2018/February/20

The Proposed Reaffirmation of the Second Edition CAN/ULC-S540, Standard for Residential Fire and Life Safety Warning Systems: Installation, Inspection, Testing and Maintenance, has been submitted to the ULC Standards Committee on Fire Alarm and Life Safety Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2018/January/04
Date Due: 2018/March/05

The Proposed Joint Standard of the First Edition ANSI/CAN/UL/ULC-1316, Standard for Fibre Reinforced Plastic Underground Tanks For Flammable and Combustible Liquids, has been submitted to the Joint UL/ULC Technical Committee on Flammable and Combustible Liquid Underground Tanks for letter ballot approval and to others interested for comment.

Date Posted: 2018/January/19
Date Due: 2018/March/19